Todo

Network

  • Build main camp equipment shelf
  • Document
    • VLAN Ports
    • Firmware upgrade process for all network devices.
    • config backup for routers and switches
  • Enable NTP on router, and all switches / servers / nodes
  • Update Traffic Shaping
    • Check if there are virtual interfaces yet that can be used to aggregate traffic out different ports.
  • Consider backup wifi link to main camp
    • Encrypt it.
    • Document keys.

Sysadmin

  • Reflash (upgrade firmware) on stuff...
    • Routers
  • Upgrade Twiki
  • implement Linux HA! at NOC
  • Finish monitoring scripts
    • Add graphing for number of leases on each AP.
    • Add SNMP based BW graphs of all nodes
      • Be able to start iperf tests with a button click, and subtract out the test results from the graphs
  • For vendors network, update filters to blocked sites and media types.

Batteries

  • Get more distilled water.
  • Mount Chargers, Install UPS
    • get Mike Head or Jim to run Romex.
    • Get battery cable contact from Ick and order cables.
  • Get trashy jeans, and clean batteries.
  • Test rest of batteries
  • Recycle old and, maybe buy some new ones.

Orders

Possible Project Pool

Big Projects

  • CMTS expansion, check in with *Jay
    • Ritz / Upper river loop using Ultra-Flex
    • New node 5? on left bank.
  • Traffic camp cable / wifi
  • Sticker booth backup wifi link
  • UPS project
  • Warebarn encosure, Check in with Mark
  • Network run to Doug's Green
  • Re-guy some OCF towers

Medium Projects

  • ESP32 / RasP iwifi monitoring
    • Locations: Sticker Booth, Fair Central?, Alice's, Ritz?
  • New backup VM server
    • Front panel
    • 2 m.2 cards as boot raid 1. 500GB?
    • 4 spinning drives. + 2 more ssds as R and W cache
    • I ask about journal SSD cache, is that seperate?
  • Wifi Survey
  • Netbox

Small Projects

  • Ritz followup / Fix
  • Lora reliability test
  • MicroTic VPN test.
  • Oxidized build
    • Add model for Force10 switches
  • Security Tower cleanup.
  • Debug DHCP stuff.
  • Graph traffic shaping stats eg queue lengths, alert when UX suffers.
    • if there is no MIB then script something using: pfctl -v -s queue
    • Use Queue names.

Notes relating to the WareBarn Project

Yah, the conversations around archaeology have been illuminating for folks. Part of the discussion is focused on the Black Oak Site, the boundaries of which encompass the Ware Barn. As it stands, your project might require consultation with the State. Rumor has it that the Fair is working on engaging an archaeological contractor to determine the boundaries of the Black Oak Site, you might be able to tag onto that project and get your project cleared. Probably have to esquire about it through Alexis and Kirsten You should have plan drawings and a description, so that the project can be evaluated by the archaeological contractors for its impact on the site.

Misc

  • Send a FAQ packet out to booth reg or vendors early each year.
    • Decide when to choose and send out passwords
  • Add cron job to bring down public network when gates open, and bring it back up after sweep is done.
  • Make envelope with passwords for OCF management.

-- ClifCox - 22 Jul 2010

-- ClifCox - 27 Oct 2010

-- ClifCox - 06 Feb 2025

This topic: OCF > WebHome > OCFIT > ToDo
Topic revision: 2025 Feb 13, clif
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback